Guiyang section long pipeline maintenance

2017-08-31

The construction pipeline of the guiyang section of the natural gas pipeline is cut into the groove


Pipe size :Φ1016

Project quantity : Break pipe construction 2, each 2 crossings

Equipment :CH1219H*2,CM1016E*2

Groove type : 30°V-Groove

Cut off the groove : Total 2 hours and 30 minutes