+86-13032278030
Site

Construction of Pipe Cutting in Zhengzhou Section

2017-08-31

The pipeline cutting construction site of the zhengzhou section of the chengdu-oil pipeline

Pipe size:Φ406*6.4/7.1

Project quantity: Break pipe construction 2, each 1 crossing

Equipment:CM406H*1

Groove type :30°V-Groove

Cut off the groove : 5-6 minutes